DXI was awarded the Bainbridge Naval Training Center redevelopment project. The site, located in historic Port Deposit, Maryland, underwent redevelopment of the existing 1,100 acres, making way for 3.7 million square feet of logistics and distribution space across 440 acres under Phase 1 of the project.
DXI operated four underground utility crews and nine grading crews, moving an average of 20,000 cubic yards of dirt per day. DXI was proud to be part of another revitalization effort that brought businesses and jobs to the area while repurposing a historic property such as Bainbridge.
Project Scope
• 1,100 acres redeveloped
• 3.7 million square feet of logistics and distribution space
• Phase 1: 440 acres
• 2.1 million cubic yards of dirt moved
• 10,000 feet of sanitary sewer piping installed
• 30,000 feet of water main piping installed
• 23,000 linear feet of storm drain installed
• 178,000 tons of stone placed
• 65,000 tons of base asphalt installed
• 23,000 tons of surface asphalt installed
• 4 underground utility crews mobilized
• 9 grading crews mobilized
• 20,000 cubic yards of dirt moved daily (average)